Beginning of July 2021 was the end of more than 3 years cooperation with Technip Energies located in Capelle aan den IJssel in Rotterdam. During this period, numerous successful projects were undertaken and completed such as BP TAR 2019, TEAM Terminals engineering services, CABOT Carbon Black Electrostatic precipitation filtering, NAM’s K17, AME-206 and L13-FD gas flowlines and AWG platform electrification.

During the course of these projects many process and process safety studies have been carried out such as Flare and Vent Study, Compressor Settle Out Pressure Calculation, Process Safety Time Calculations, HAZOP and IPF (SIL) studies, Vent calculations and location study, Fire and Gas Mapping studies, Ignition Source Analysis (ISA), Manual Of Permitted Operations ( MOPO), FIRE Protection Analysis (FIREPRAN), Emergency System Survivability Analysis (ESSA), Hazardous Area Classification Memorandum and updating existing Hazardous Area Classification Drawings, Scenario Based Fire Fighting and Rescue Plan (SBBRP), Porto Cabins Siting Study, to name a few.

Please share this content.